Workhead, grade and builder licence.

BCA’s Contractors Registration System, or CRS, groups companies by the type of work they perform. Workhead codes describe those activities. Grades have financial, project and personnel requirements. Builder licensing is a separate scheme for regulated building work.

CW, CR, ME, TR and RW workhead groups

GroupWhat it covers
CWConstruction workheads, including general building and civil engineering.
CRConstruction-related specialist categories, including CR01 Minor Construction Works and CR03 substantial structural demolition.
MEMechanical and electrical categories, including ME01 air-conditioning, ME04 communications/security and ME05 electrical engineering.
TRTrade categories; review the current category’s specific conditions.
RWRegulatory workheads with their own scope and supporting requirements.

Do not confuse CRS groups with separate facilities management or supply registries. Read the current specific requirements for the chosen code.

CW: construction workheads.

CW includes general building and civil engineering. Grades run from C3 through C2, C1, B2, B1, A2 and A1. Higher grades need stronger financial capacity, track record and personnel, with additional requirements where specified.

CW gradePublic tender limit, July 2026–June 2027
C3$800,000
C2$1.6 million
C1$5 million
B2$16 million
B1$50 million
A2$105 million
A1Unlimited

A tender can still require a particular workhead, additional qualifications or other conditions. The grade alone does not guarantee eligibility.

CR: construction-related categories.

CR01 Minor Construction Works, which includes landscaping, is Single Grade, with $50,000 paid-up capital and net worth, $300,000 relevant track record and one T, subject to its qualification allowances. CR03 concerns whole-building or substantial structural demolition, rather than ordinary renovation hacking. Several categories attach specialist licences: check CR08, CR10A, CR10B, CR12 and CR15; CR17 requires RW01.

CR10A is an important exception: it has a $2 million paid-up-capital requirement but no net-worth or track-record requirement. Do not misread that amount as a required completed-project value. Higher-grade CR records have additional Singapore, main-contract and single-project conditions: at L4 a $500,000 single project, at L5 $1 million, and at L6 $7.5 million Singapore projects, $3 million main contracts and $3 million single project. Use the full SRR table for the target grade.

ME workhead scopes

  • ME01: air-conditioning, refrigeration and ventilation work.
  • ME04: communications, CCTV, alarm, access/carpark security and CATV installation or maintenance.
  • ME05: electrical systems and installations.
  • ME08 and ME15: review the applicable IMDA class-licence requirements.

For ME01–ME13 Grade L1, review both $50,000 paid-up capital and $50,000 net worth, $300,000 of relevant track record over the preceding three years, and one qualifying T technical person. L1 does not impose the three-year personnel-experience condition used at L2. New or additional entry-grade applications can use relevant ongoing as well as completed projects.

Paid-up capital is the amount shareholders have paid for their shares. Net worth is assets minus liabilities, supported by accounts; a $50,000 bank balance alone does not establish $50,000 net worth. Management accounts can be used at L1, while L2–L6 require audited accounts. Requirements vary by workhead; do not apply an ME table to every CRS category.

CRS technical personnel are different from a builder’s Technical Controller. They must be full-time and employed only by the applicant. Local or PR technical personnel need evidence of at least $2,400 monthly salary. For ME workheads, relevant mechanical, electrical or electronics diploma routes and BCA-approved alternatives apply. Some workheads allow specific EMA or M&E Coordination credentials; check the actual category before hiring or enrolling in a course.

For ME05, EMA electricians can count as T at L1/L2 and electrical engineers or technicians at L3–L5. M&E Coordination certificate holders may count as T for ME04, ME05 and specified other categories at L1–L5. These are workhead-specific allowances, not universal substitutions.

TR and RW registration requirements

A category’s name is only a starting point. Check its actual scope, minimum resources, specialist licences and technical appointments. Registering a broad company business activity with ACRA is not evidence that BCA has approved a workhead.

Can one project support multiple workheads?

A contract with several relevant components may support multiple workheads using a clear scope and value breakdown. Do not count the whole contract value indiscriminately for each category. “Past three years” is an evidence window, not a requirement to wait three years before applying.

New firms and public tender limits.

Eligible new firms without the full entry-grade track record may be considered for probationary L1, C3 or Single Grade registration, excluding CR10A, if other requirements are met. Relevant ongoing or completed projects must start during the probation period and total at least $100,000. Successful assessment can give a further two years. Repeat-application restrictions also apply, including through certain shareholders. Probation is a route for BCA to assess, not an automatic approval.

GradeCR / ME tender limit
L1$800,000
L2$1.6 million
L3$5 million
L4$8 million
L5$16 million
L6 / Single GradeUnlimited

These public-sector tender limits apply from 1 July 2026 to 30 June 2027. They do not replace the tender’s workhead and other conditions, guarantee an award, or set the separate GB2 builder licence’s $6 million ceiling.

CW financial and personnel comparison.

GradeFinancialTrack record, past 3 yearsPersonnel
C3SGD 50,000SGD 300,0001 RP, P or T
C2SGD 100,000SGD 1m1 RP or P, or 2 T
C1SGD 300,000SGD 3m1 RP or P, plus 1 T
B2SGD 1mSGD 10m3 personnel, at least 1 RP and 1 ACCP, SDCP or CCPP
B1SGD 3mSGD 30m6 personnel, at least 2 RP and 1 SDCP or CCPP
A2SGD 6.5mSGD 65m12 personnel, at least 4 RP and 1 SDCP or CCPP
A1SGD 15mSGD 150m24 personnel, at least 8 RP and 1 SDCP or CCPP

Read the current specific requirements for all workhead exceptions and subconditions; these comparisons do not replace the full SRR.

CR workhead directory.

CodeWorkheadCodeWorkhead
CR01Minor Construction WorksCR10BPrecast Concrete Production
CR02Corrosion ProtectionCR11Signcraft Installation
CR03DemolitionCR12Ground Support and Stabilisation Works
CR04Fencing and IronworksCR13Waterproofing Installation
CR05Concrete RepairsCR14Asphalt Works and Road Marking
CR06Interior Decoration and Finishing WorksCR15Site Investigation, Instrumentation and Monitoring
CR07Cable and Pipe Laying, Road ReinstatementCR16Curtain Walls
CR08Piling WorksCR17Windows
CR09Repairs and RedecorationCR18Doors
CR10AAutomated Precast Concrete Production  

Read the current specific requirements for all workhead exceptions and subconditions; these comparisons do not replace the full SRR.

CR grade comparison and exceptions.

GradeFinancialTrack record, past 3 yearsPersonnel
Single GradeSGD 50,000SGD 300,000 for ordinary applicable workheads; CR10A has no track-record requirement1 T
L1SGD 50,000SGD 300,0001 T
L2SGD 50,000SGD 1m1 T with 3 years of relevant experience
L3SGD 150,000SGD 3m2 T
L4SGD 250,000SGD 5m, including a SGD 500,000 single project2 T, one with 5 years of experience
L5SGD 500,000SGD 10m, including a SGD 1m single project1 P, or 2 T with one at 8 years of experience
L6SGD 1.5mSGD 30m, including SGD 7.5m Singapore projects, SGD 3m main contracts and SGD 3m single project2 P with 5 years of experience, including 1 SDCP

Read the current specific requirements for all workhead exceptions and subconditions; these comparisons do not replace the full SRR. CR10A is an exception: SGD 2m paid-up capital, with no net-worth or track-record requirement. The ordinary Single Grade row does not override its specific conditions.

ME workhead directory.

CodeWorkheadCodeWorkhead
ME01Air-Conditioning, Refrigeration and Ventilation WorksME08Internal Wiring for Telecommunications
ME02Building Automation, Industrial and Process Control SystemsME09Lift, Escalator and Mechanised Car Parking Systems
ME03Solar PV and System IntegrationME10Line Plant Cabling and Wiring for Telecommunications
ME04Communication and Security SystemsME11Mechanical Engineering
ME05Electrical EngineeringME12Plumbing, Gas Piping and Sanitary Works
ME06Fire Prevention and Protection SystemsME13Traffic Light Systems
ME07High and Low Tension Overhead Line InstallationME15Integrated Building Services

Read the current specific requirements for all workhead exceptions and subconditions; these comparisons do not replace the full SRR.

ME01–ME13 grade comparison.

GradeFinancialTrack record, past 3 yearsPersonnel
L1SGD 50,000SGD 300,0001 T (no three-year experience condition at L1)
L2SGD 50,000SGD 1m1 T with 3 years of relevant experience
L3SGD 150,000SGD 3m2 T
L4SGD 250,000SGD 5m, including a single contract of SGD 500,0002 T, one with 5 years of experience
L5SGD 500,000SGD 10m, including a single contract of SGD 1m1 P, or 2 T with one at 8 years of experience
L6SGD 1.5mSGD 30m, with sub-thresholds for Singapore projects, main contracts and single contracts2 P with 5 years of experience, including 1 SDCP except for ME07 and ME13

Read the current specific requirements for all workhead exceptions and subconditions; these comparisons do not replace the full SRR. The ME SRR is August 2026. ME15 has its own requirements and is not part of this ME01–ME13 comparison.

TR trade directory.

CodeTradeCodeTrade
TR01FormworkTR06Ceiling Work
TR02Steel Reinforcement WorkTR07Tile, Marble and Stone Work
TR03Concreting WorkTR08Timber, Vinyl and Laminate Flooring Work
TR04Drywall InstallationTR09Plastering and Skimming
TR05Precast InstallationTR10Ironmongery and Metalwork

Read the current specific requirements for all workhead exceptions and subconditions; these comparisons do not replace the full SRR.

RW regulatory directory.

CodeWorkhead
RW01Window Contractors
RW02A / RW02BLift Installation Contractor / Lift Maintenance Contractor
RW03A / RW03BEscalator Installation Contractor / Escalator Maintenance Contractor
RW04A / RW04BMechanised Car Parking Systems Installation / Maintenance Contractor

Read the current specific requirements for all workhead exceptions and subconditions; these comparisons do not replace the full SRR.

What should you prepare?

  • Company profile, ownership and relevant business scope.
  • Accounts establishing the required paid-up capital and net worth.
  • Personnel qualifications, identity, employment and experience records where required.
  • Contracts with relevant scope and value breakdowns, plus evidence of ongoing or completed work.
  • Workhead-specific licences, certificates and other supporting documents.

Start by listing the actual jobs your company performs and identifying the relevant parts of each contract. Then compare your capital, accounts and personnel against the current workhead requirements.

Match the workhead to the contract scope

Use the scope of work, drawings and specifications rather than the company name to shortlist a workhead. A business describing itself as an engineering contractor might carry out electrical installation, communication systems, mechanical work or several distinct activities. Its registration should match the work it wants to tender for.

For mixed work, identify the principal and supporting activities, and ask the procuring party which registration is required. Check each workhead’s current conditions: personnel, experience, financial records, track record and any separate regulator licence. Do not assume approval for one workhead establishes eligibility for another.

  • List completed contracts by actual scope, completion date and value.
  • Separate the company’s track record from a director’s previous employer’s projects.
  • Map proposed personnel to each workhead’s qualification rules.
  • Check the applicable tendering limit for the intended grade.

The ME04 and ME05 guides explain two commonly confused categories.

Frequently asked questions

Can I use my previous employer’s contracts as company track record?

Do not treat those contracts as the applicant company’s own work. Assess personal experience and company track record separately.

Can I hold more than one workhead?

Yes, where the company meets each workhead’s requirements. A contract may support relevant apportioned scopes rather than its entire value being counted for every category.

Does a new company have to wait three years?

No. Three years is a track-record evidence window, not a mandatory waiting period. Relevant ongoing projects and an eligible probationary route may be considered.